Skip to main content

The information memorandum, drafted from what the deal already knows.

The IM follows the valuation as its own engagement. Every section starts from facts the app has already checked, so the draft says what the deal supports.

Access is by invitation while practices come on in small groups.

The IM Builder in the dark theme: 23 of 23 sections approved and the live PDF preview.
2
documents: the information memorandum and the executive summary
3
exports: PDF, Word and an editable PowerPoint deck
1 by 1
sections: fact-check, draft, review, sign-off
Every
AI-drafted section logged: who drafted it, who edited it, who accepted it

Facts first

Nothing is drafted until the facts are approved.

For each section the builder pulls out the facts it needs, each with its source and a verified or unverified flag. You approve the facts; the draft may use only those.

  • Pulls in intake answers, the business snapshot, financials, confirmed add-backs and call transcripts.
  • Drafting shaped by a reference library of real information memoranda and executive summaries, not a generic template.
  • A codenamed IM hides the business's name, region and identifying terms.
The IM Builder for Harbourline Coffee Roasters: 23 of 23 sections approved beside a live PDF preview of the information memorandum cover.

Review

The broker and the seller settle the wording before anything is sent.

A section rail shows the state of every section and what to do next. Comments sit on each section, and sign-off is held back until every comment is resolved.

  • Comments and replies on each section, with open threads shown on the rail.
  • Sign-off by the deal owner or an admin only, once the section is drafted and resolved.
  • Send a section back for changes with a note it is redrafted against.
The IM Builder in the dark theme: 23 of 23 sections approved and the live PDF preview.

From the deal

Start one from a deal, keep every IM on one list.

A new IM starts from a deal picker, and every IM in the workspace sits on one work list with the state of each section.

  • Set the industry template, page orientation and brand colours and logo for each IM.
  • Save named versions of the whole document and restore an earlier one.
  • Assemble and file the finished IM against the deal once every required section is approved.
The Harbourline Coffee Roasters deal: all four workflow steps complete, no blockers, the deal agent, a sign-off check of 96 out of 100 and what has happened since your last visit.

Questions

IM Builder: what people ask.

Does AI write the memorandum?

Where AI is switched on for the deal, it drafts a section from the facts you have approved. Every section records whether AI drafted it, who edited it and who accepted it, and that record downloads as a spreadsheet. If AI is off, drafting is off and the app says so.

Do I need a valuation first?

The IM is designed to follow a completed valuation, so it can draw on the financials, intake and valuation already on the deal.

What does the buyer receive?

The PDF is what is filed and sent to buyers. Word and PowerPoint exports are there when you want to edit by hand, with tables and charts still editable.

What if the deal's figures change after a section is approved?

The section's approval is marked stale, and the rail and the review panel say so, so an out-of-date section is not sent by accident.

See im builder on a real mandate.

A walkthrough takes under an hour and runs through the path a deal takes in the app. Access is by invitation.